APEX Envirocare supplied Aqua Barriers to dewater an environmentally sensitive area along the Swan River for road construction.
APEX Envirocare supplied Aqua Barriers to dewater an environmentally sensitive area along the Swan River for road construction.
APEX Envirocare was selected to dredge the bore field pond and restore its functionality, ensuring the site could return to optimal operations.
APEX Envirocare was engaged to carry out dredging and desludging works on a Waste Water Treatment Plant pond in the heart of WA’s Wheatbelt region.
Working across a large site and large pond, the recently completed farm project was commissioned to return a working wastewater pond back to its original capacity.
This urban lake dredging and desludging in this project in Roslea Estate was commissioned to remedy an odour issue resulting from excess sludge in the lake.
West Lake (near the Narrows bridge) in the heart of Perth CBD underwent Phoslock application as the lake was showing signs of being over-enriched with naturally occurring nutrients.
Our approach involved specialist dredge equipment with advanced features designed to handle challenging WWTP conditions.